Saudi
Aramco
Ras Tanura |
NGL
CONTROL SYSTEMS UPGRADE - RAS TANURA REFINERY
Procure, supply, install, construct, pre-commission
and cutover the new facilities. It includes replacement
of obsolete Relay-based ESD and Auxiliary systems
with new process automation systems, install new homerun
cables, new smart 4-20 MA transmitters, convert existing
pneumatic control loops to electronic control loops,
install new DCS and ESD systems, install new control
system equipment, interface the new control systems
to the existing plant facilities, demolish the existing
relay-based and Foxboro control systems, etc.
(2005-2006) |
Al Khafji
Joint Operations
Al Khafji
|
EPC
SEWAGE TREATMENT PLANT & ASSOCIATED WORKS PACKAGE
Design, engineering, procurement, construction, inspection,
testing and commissioning of sewage treatment plant
with 2,000 m3 per day capacity and associated civil,
mechanical, electrical and instrumentation works.
(2004-2005) |
Zuhair
Fayez/ Ministry of Defense & Aviation
Riyadh |
ROYAL
TERMINAL
Design, supply and installation of all interior and
exterior lighting and small power, low voltage distribution
system, including panel boards, motor control centers
and LV feeders, HV (13.8kV) distribution system consisting
of 10 HV/LV substations with 9 MVA capacity and HV
cabling. |
Technip/Saudi
Aramco
Abqaiq |
REPLACE
POWER GENERATORS FOR THE FIRST CO-GENERATION PLANT
AT ABQAIQ PLANTS
Electrical: Installation of power cables and equipment
together with system and equipment grounding networks,
including upgrading of two 69 kV substations and equipment
yards, overhead line termination frames, SF6 breakers,
disconnects, transformers and HVAC systems. |
SWCC/BECHTEL
Shoaiba |
SHOAIBA
POWER & DESALINATION PLANT
Installation, testing and commissioning of a complete
HVAC and fire protection system (Wet pipe sprinkler,
deluge and pre-action system).
(2000-2003) |
Technip/
Saudi Aramco
Haradh |
HARADH
GAS PLANT PROJECT
Installation of mechanical/plumbing, power distribution,
electrical and lighting systems to all buildings.
(2001-2003) |
Consolidated
Contracting & Engineering Co. (CCC)
Haradh |
HARADH
GAS PLANT PROJECT
Installation and commissioning of complete HVAC system
to 19 buildings.
(2001-2003) |
Sultan
Bin Abdul Aziz Charity Foundation
Riyadh |
CITY
FOR HUMANITARIAN SERVICES (400-BED MEDICAL COMPLEX
& ASSOCIATED FACILITIES)
Electrical works: Installation, wiring and termination
of a 23,000 KVA power distribution system, including
LV & MV generators, transformers, unit substations
and UPS systems.
(1998-2001) |
Sultan
Bin Abdul Aziz Charity Foundation
Riyadh |
CITY
FOR HUMANITARIAN SERVICES (400-BED MEDICAL COMPLEX
& ASSOCIATED FACILITIES)
Mechanical works: Installation of complete HVAC system,
including four 1000 TR water cooled centrifugal liquid
chillers, 4 cooling towers and associated mechanical
works, plumbing & drainage system, medical gas
system, fire protection system with a sophisticated
wet pipe sprinkler system and an electronically operated
FM 200 system.
(1998-2001) |
MODA/
Zuhair Fayez
Jubail Naval Base
Jubail |
115
KV SUB-STATION
Design, engineering, supply, construction, installation
testing and commissioning of 115/13.8 KV substation,
including laying of 15 km 115 KV XLPE/PVC underground
cable and associated civil works.
(1998-1999) |
MODA/
Zuhair Fayez
Jubail Naval Base
Jubail |
SEWAGE
TREATMENT PLANT
Design, supply and construct a sewage treatment plant
with 1,600,000 GPD, including provision of new sewage
transfer pumping stations and associated works.
(1998-1999) |
Themar
Commercial & Business Development
Makkah |
AL
DHIYAFAH SHOPPING MALL
Design, supply, installation and commissioning electrical,
mechanical/plumbing, fire protection and HVAC system
(Chilled water – 1840 Tons).
(1999-2001) |
MODA/Zuhair
Fayez
Riyadh |
OFFICERS
CLUB FOR THE INTERNAL SECURITY FORCES
Design, supply, installation and commissioning of
electrical, plumbing, fire protection and HVAC system
(DX Coil – 340 Tons).
(1999-2001) |
Ministry
of Defense & Aviation
Royal Saudi Naval Force
Jubail |
HUNTER
PHASE III
Design, supply, install and commissioning of HVAC,
mechanical/plumbing, electrical & lighting systems.
(1996-1999) |
Saudi
Industrial Development Co
(SIDC)/Costain
Jeddah |
SMC
COLOR COATING PLANT
Design, supply, installation and commissioning of
central air-conditioning system, power distribution
and lighting system within the process and warehouse
buildings.
(1997-1999) |
Saudi
Voest Alpine/Hadeed
Jubail |
HADEED
PHASE II
Design, supply, install and commissioning of complete
HVAC system (chilled water and DX coil 1200 tons)
in 110 buildings, including mechanical/plumbing, electrical
and lighting systems.
(1997-2000) |
Ministry
of Defense & Aviation
(MODA)
Tabuk |
EXPANSION
OF A CITY
Combined potable and fire water distribution, water
treatment plant, including fire fighting / detection
system, 13.8kV, 380/220V, 60hz packaged substations,
power distribution, telephone network (civil &
military system), computer cable distribution network,
satellite and television, mosque sound system, grounding
and lightning protection and DC rectifiers.
(1996-1997) |
IBN
RUSHD
Jubail |
POLYSTER
PLANT
Design, installation and commissioning of HVAC, power
distribution, telephone and fire alarm, mechanical/plumbing
systems.
(1996-1997) |
Saudi
Iron and Steel Industries (HADEED)
Jubail |
HADEED
STEEL MILL - SF6 SWITCHGEAR ROOM
Supply, installation and commissioning of HVAC,
lighting and power distribution, fire and telephone
systems.
(1996)
|
Saudi
Aramco
Dhahran |
FACILITIES
IMPROVEMENT AT DHAHRAN AIR FUELING UNIT AND DAMMAM
WORLSHIP AND FIRE HOUSE
13.8KV switchgear pad and installation of 13.8KV ring
main unit and underground 13.8KV primary distribution
cables, 500 KVA, 13800-480/277 volt distribution pad
mounted transformers, firewater pumps and piping work. |
Saudi
Aramco
Safaniyah |
GOSP
EXPANSION – 115 KV SUB-STATION
Installation of electrical services, including 115kV
sub-station and underground distribution, 3.6 KV switchgear,
motor starters, cabling and instrumentation.
(1992) |
Saudi
Aramco
Dhahran |
SUB-STATION
Installation of 115 KV and 13.8 KV sub-stations, cabling
and instrumentation.
(1986-1989) |
Saudi
Aramco
Dhahran, Ras Tanura & Abqaiq |
UPGRADE
UTILITIES
Installation of switchgear, transformers and underground
cabling to reinforce and extend electrical supply.
Works include installation of overhead lines, transformers
and drilling for cathodic protection. |