Saudi
Aramco-Shoaiba |
SHY-1
NGL PIPELINE UPGRADE AT PUMP STATION # 06 (LSTK PROJECT)
Detailed design, engineering, procurement of material
and equipment, construction/installation of the NGL
SHY-1 pumping station including but not limited to all
associated civil, piping, electrical, instrumentation,
communication and mechanical works.
(2005-2007) |
Najran
Cement Co.-Najran |
NAJRAN
CEMENT PLANT
Construction of a new Greenfield cement plant with a
capacity of 6,000 tpd OPC/SPRC clinker including a power
plant, residential village/colony, all associated equipment,
auxiliaries and infrastructure.
(2005-2007) |
Saudi
Aramco-Juaymah |
JUAYMAH
GAS PLANT EXPANSION – MECHANICAL TIE-INS
Site survey, site preparation, fencing, supply all materials
for civil/ structural and piping tie-in works. Also
demolition of existing piping/supports, fabricate and
install new piping including Tie-Ins and modifications
to existing piping and supports, systems/subsystems/lines
Isolation and blinding, hydro-testing and lay up, NDT
of welds, painting, coating to all piping and structural
steel supports and insulation to all piping, valves
and fittings.
(2005-2006) |
Saudi
Aramco |
PLANT WORKS
CONSTRUCTION FOR BULK PLANTS
The project requirements includes Additional Capacity
Requirements (BI-10-03550) and Two Grades of Gasoline
(BI-10-03547) at Miscellaneous Bulk Plants in Central
Region. Also includes civil/structural, mechanical/
piping, electrical/instrumentation works.
(2005-2006) |
US Army
Corps of Engineers
Thumrait Air Base-Sultanate of Oman |
TANKER TRANSPORT
OFFLOADING FACILITY
Construction of Administration/Filter/Water System Pump/
Buildings, fuel distribution system including offloading
stations, sunshades, fuel spill/runoff containment and
modifications to POL storage, roads and parking, site
electrical including substations and generator, sanitary
sewer system, water system including water tanks.
(2005-2006) |
Technip/Saudi
Aramco-Riyadh |
RIYADH REFINERY
– DIESEL HYDROTREATER FACILITY
Civil/ buildings, structural/ mechanical/ piping/ equipment
erection, heavy lift, electrical/instrumentation, HVAC,
sandblasting/painting, cathodic protection, and assistance
to final commissioning work.
(2004-2005) |
Saudi
Aramco-Yanbu |
INTEGRATION
OF NEW STEAM AND POWER GENERATION AT YANBU NGL PLANT
Civil, Mechanical/Piping/Equipment Erection, heavy lift,
structural steel erection, painting/insulation and associated
works.
(2003-2004) |
Saudi
Aramco-Juaymah |
FIRE
TRAINING CENTER
Construction of a complete Fire Training Center including
integrated process complex, integrated structural complex,
water & fuel tanks, water treatment plant, substation,
control station, external utilities, mechanical, electrical,
instrumentation and fire water system.
(2003-2004) |
TECHNIP/Saudi
Aramco-Haradh |
HARADH
GAS PLANT
Construction of all utilities and offsite facilities
necessary for Haradh Gas Development Program, including
all civil works, buildings, piping and mechanical erection,
heavy lift, structural steel erection, insulation and
painting works.
(2001-2003) |
Saudi
Aramco-Rabigh Refinery |
LPG
TRUCK LOADING FACILITY
Civil, Structural, Piping fabrication and erection,
equipment erection, electrical/instrumentation, insulation
and piping works.
(2001-2003) |
Saudi
Aramco -Abqaiq Plants |
WASTE
WATER ENVIRONMENTAL PROTECTION
Installation of new equipment and approximate 23 Km
of pipeline to transfer industrial waste water including
construction of a 172,884 barrel carbon steel umbrella
roof atmospheric surge tank and associated works.
(2000-2002) |
TPL
Arabia/Saudi Aramco-Abqaiq |
POWER
PLANT UPGRADE (CO-GENERATION PLANT)
Replacement of the existing Power Plant Combustion Gas
Turbine Generators (CGTG 4,5 & 6) with three (3)
new CGTG (42 MW) with non-fired Heat Recovery Steam
Generators with a new control system.
(2000-2002) |
Saudi
Aramco-Tabuk & Duba |
TABUK
& DUBA FIRE FIGHTING PROJECTS
Installation, testing, commissioning of two firewater
jockey pumps, firewater storage tank, new firewater
piping including all civil, mechanical, electrical and
instrumentation works.
(1998-1999) |
Al-Jubail
Petrochemical Co.
(KEMYA)-Jubail |
KEMYA
EXPANSION - EARLY CONSTRUCTION WORKS
Relocation/transfer of the existing plant and facilities,
and demolition of structures and underground facilities
to clear the areas for the construction of a grass root
Low Density Polyethylene Plant (LDPE).
(1998-1999) |
Arabian
Petrochemical Co., (PETROKEMYA)-Jubail |
CONSTRUCTION
OF 5TH SEA WATER PUMP
All civil, structural, piping pre-fabrication and erection
work.
(1996-1997) |
U.S.
Corps of Engineers |
REPLACE
DESALT PLANT BOILER
Installation, testing and commissioning of 3 numbers
steam generating plant boilers including feed water
system, chemical feed systems, pumps, piping, valves
control, instrumentation and air system.
(1996-1997) |
Saudi
Aramco-Riyadh |
HYDROSTATIC
TANK GAUGING
Hydrostatic tank gauging system at Riyadh Refinery,
for 73 tanks including hot tapping installation of 36”
long thermo-wells, hydro-testing, NDT, Top End System
with provision for addition of tank and radar tank gauging.
(1993-1995) |
Al Jomaih
Company |
CONSTRUCTION
OF CAN MAKING FACTORY
Equipment erection, piping, mechanical, electrical and
instrumentation works.
(1995) |
National
Plastic Company
(IBN HAYYAN)/SNAMPROGETTI |
PASTE
PLANT PROJECT – MECHANICAL WORKS
Site preparation, underground utilities, structural
steel, foundations and concrete structures, piping fabrication
and erection, equipment erection, tank fabrication and
erection, HVAC, sandblasting & painting, pre-commissioning
and assistance to commissioning.
(1993-1995) |
Saudi
Aramco |
ZULUF
ARABIAN WET CRUDE HANDLING FACILITIES
Civil, structural steel, mechanical, heavy lift erection,
piping, electrical, instrumentation, painting, insulation,
fire protection, pre-commissioning and assistance to
commissioning.
(1992-1994) |
Saudi
Aramco-Hawiyah |
HAWIYAH
CENTRAL WATER INJECTION PLANT (HAWIP) PROJECT
Site preparation, civil, structural, mechanical, piping,
heavy lift, equipment erection, electrical, instrumentation,
HVAC, sandblasting, painting, cathodic protection and
assistance to commissioning works including subcontract
for up-rating of GE Gas Turbines.
(1992-1993) |
MANNESMANN ANLAGENBAU/Saudi Aramco |
INCREASE
YANBU CRUDE EXPORT CAPACITY PUMP STATIONS & PLANTS
(GROUP II P.S. NOS. 5,6,7 & 8) SURGE RELIEF STATIONS.
(1990-1993) |
SAUDI
ARAMCO |
REPLACE
HIGH LIFT PUMPS AND SEAWATER DISTRIBUTION SYSTEM
Civil, building, structural, mechanical, piping electrical,
instrumentation, sandblasting/painting and commissioning
work.
(1991-1993) |
Continental
Can of Saudi Arabia Limited |
CONSTRUCTION
OF CAN MANUFACTURING FACTORY
Structural steel fabrication & erection, equipment
erection, electrical & instrumentation testing,
commissioning and painting works.
(1991-1992) |
Saudi
Aramco |
CONSTRUCTION
OF HIGH PRESSURE DI-GLYCALAMINE PLANT (HI-DGA)
Site preparation, civil, structural, mechanical, piping
electrical, instrumentation, HVAC, sandblasting, painting,
cathodic protection, heavy lift, equipment erection
and assistance to commissioning work.
(1990-1991) |
Saline
Water Conversion Corp. (SWCC)/ TECHNIP |
POWER DESALINATION
PLANT
Construction of all civil and utility buildings, structural
steel erection, mechanical/piping erection, electrical,
instrumentation, HVAC, sandblasting/painting, cathodic
protection and assistance to commissioning works.
(1998-1990) |
Saudi
Aramco |
CONSTRUCTION
OF UGOSP-6 GAS GATHERING FACILITIES
Site preparation, civil, control building, structural
steel, mechanical/piping, electrical, instrumentation,
HVAC, sandblasting/painting, cathodic protection, heavy
lift, equipment erection & assistance to commissioning
works.
(1989-1991) |
Royal Commission
for Jubail & Yanbu |
OPERATION
& MAINTENANCE FOR SEAWATER COOLING SYSTEM
Operations and maintenance of Seawater Cooling System
for primary & secondary Industries at Jubail Industrial
City.
(1987-1990) |
National Glass Ind.
Company / Technologie Progetti Lavori SPA |
CONSTRUCTION OF GLASS
BOTTLE FACTORY
All civil, structural steel erection, piping erection,
electrical and instrumentation, process equipment erection,
painting and insulation works
(1989-1990) |
SWCC/ Penta Ocean
Const. Co. Ltd. |
POWER DESALINATION PLANT
Construction of all civil and utility buildings, structural
steel erection, mechanical/piping erection, electrical,
instrumentation, HVAC, sandblasting/painting, cathodic
protection and assistance to commissioning works.
(1985-1989) |
Arabian Gulf Oil
Company
(AGOC) |
CONSTRUCTION
OF LUBE OIL BLENDING PLANT
Detail design & engineering, procurement, supply,
fabrication, erection commissioning and initial operation
and maintenance of the plant.
(1987-1988) |
JGC Corporation-Kuwait |
(KNPC) KUWAIT REFINERY
MODERNIZATION & UPGRADING WORKS
All civil, structural steel, piping, mechanical, electrical,
instrumentation, sandblasting/painting, cathodic protection,
insulation works.
(1982-1987) |
PETROKEMYA |
CONSTRUCTION
OF POLYSTYRENE PLANT
All civil, structural steel, mechanical, electrical,
instrumentation, HVAC, painting, insulation, cathodic
protection, pre-commissioning & assistance to final
commissioning.
(1986-1987) |
SWCC/ Penta Ocean
Const. Co. Ltd. |
MAKKAH-TAIF
DESALINATION PLANT
All civil and utility buildings, structural steel erection,
mechanical/piping erection, electrical, instrumentation,
HVAC, sandblasting/painting, cathodic protection and
assistance to commissioning works.
(1984-1987) |
Mitsubishi Corporation |
LIMESTONE
CRUSHING PLANT & TRANSPORT-ATION SYSTEM, AL-JADIDAH
QUARRY DEV. PROJECT
All civil, structural steel, piping, mechanical, electrical,
instrumentation, sandblasting/ painting, cathodic protection,
insulation & commissioning work.
(1986-1987) |
Al Jubail Petrochemical
Co. (KEMYA) |
CONSTRUCTION
SERVICE AND MODIFICATION OF LLDPE PLANT
All civil, structural steel, piping, mechanical, electrical,
instrumentation, sandblasting/ painting, cathodic protection,
insulation works.
(1985-1990) |
Saudi Aramco |
PUMP STATIONS (PS 5-8)
Modification Segment of the East / West Crude Pipeline
Capacity
(1986) |
Saudi Aramco |
RAS
TANURA REFINERY MODERNIZATION
Civil, utility, buildings, structural, mechanical piping,
electrical, HVAC and instrumentation works.
(1983-1986) |
Royal Commission |
SANITARY
WASTE WATER TREATMENT PLANT NO. 9, STAGE2
Civil, buildings, structural steel, mechanical piping,
electrical, instrumentation, HVAC, commissioning &
initial operation and maintenance works.
(1982-1986) |